Metro trains were restored in Kyiv in Kyiv.
Public utilities continuously worked within 13 hours in order to eliminate the consequences of the night shelling of the Russian language as soon as possible. The work included connections of dozens of communication, alarm verification system, electricity, management and testing of infrastructure for transport. The Kyiv Metro municipal enterprise reported Facebook.
It is noted that before the regular movement of the line, the experts launched a test train to make sure that the site was ready to transport passengers.
We recall that in Kyiv, as a result of the fall of garbage and hits, there were damaged objects of civil infrastructure, dwellings, cars, as well as metro routes. It was originally planned that it took 24 hours to restore the entire red line of the metro line of the capital between Lizova and Arsenal. The authorities organized a bus route.
In addition, from the Russian shelling in Kyiv, 2 thousand 167 families from the left bank of the Donper were left without electricity.
Source: Racurs

I am David Wyatt, a professional writer and journalist for Buna Times. I specialize in the world section of news coverage, where I bring to light stories and issues that affect us globally. As a graduate of Journalism, I have always had the passion to spread knowledge through writing.