HomeEconomySlavic TPP continued work...

Slavic TPP continued work on Donbass

Photo: Slavinfo.dn.ua

During the previous heat season, the Slavic TPP worked only 55 days, until December 25, when a massive flow took place.

The Slavic TPP continued to produce electricity. On Monday, June 9, Donbasenergo reported to the Smida Information Disclosure System as a significant event for steikolders.

The message states that the importance of the event is that producing electric energy is Donbasenergo’s primary activity.

At the same time, on June 3, Donbasenergo posted information on SMIDA that the Slavic TPP with a capacity of 880 MW temporarily stopped generation.

As the Interfax-Ukraine commemorated, on April 10, the Donbasenergo board, Oleg Laronov, noted that the Slavic TPP worked on OPP-2024/2025 55 days, and after the Russian strike on December 25, 2024, he lost the opportunity to issue an economy.

“We have a station left. From the beginning of the heat period, it only worked 55 days, until December 25, when a massive shelling occurred. Unfortunately, the station lost its basic equipment,” then Lariveov.

According to him, during the heat, the station underwent five raids, as a result of which the possibility of electricity was lost within four to seven days, but each time managed to restore it.

Remember, on December 25, 2024, the Russians conducted a massive attack on the energy system. Ukrenergo introduced steps to tighten electricity consumption.

News from CORRESPONDENT.NET On the telegram and whatsapp. Subscribe to our channels https://t.me/KorresPondentNet and WhatsApp

Source: korrespondent

- A word from our sponsors -

Most Popular

LEAVE A REPLY

Please enter your comment!
Please enter your name here

More from Author

- A word from our sponsors -

Read Now