The return of the thousand-ton power unit to operation will significantly strengthen the energy system, Energoatom assured.
A power unit at one of the nuclear power plants in Ukraine is connected to the network after scheduled maintenance. Energoatom reported this on Wednesday, July 17.
“Energoatom connected the next power unit to the network ahead of schedule – after nuclear fuel reloading and scheduled equipment repairs,” the statement said.
It was noted that the return of the thousand-ton power unit to operation will significantly strengthen the energy system.
“Due to the difficult situation in the energy sector, the company’s specialists are making every effort to promptly perform the scheduled maintenance while ensuring the required quality of work,” Energoatom assured.
It was also reported that all other nuclear power units located in the territory controlled by Ukraine are operating according to plan.
Let us remind you that today in Ukraine there will be a hard shutdown until the evening. Due to bad weather, shelling and technical reasons, almost 660 settlements in nine regions were cut off.
In the past, energy experts predicted that July would be the most difficult period for the Ukrainian energy system. It is at this time that nuclear power plants undergo scheduled maintenance.
In this regard, Prime Minister Denis Shmygal announced that the duration of the outages will soon be reduced.
New Correspondent.net on Telegram and WhatsApp. Subscribe to our channels Athletistic and WhatsApp
Source: korrespondent

I’m Liza Grey, an experienced news writer and author at the Buna Times. I specialize in writing about economic issues, with a focus on uncovering stories that have a positive impact on society. With over seven years of experience in the news industry, I am highly knowledgeable about current events and the ways in which they affect our daily lives.