HomeEconomyDTEK mines launched two...

DTEK mines launched two new coal faces

Photo: energo.dtek.com

In total, 26 new coal faces are planned to be operated in the energy holding mine by 2024.

Normal
0

false
false
false

RU
X-NONE
X-NONE

/* Style Definitions */
table.MsoNormalTable
{mso-style-name:”Звичайна таблиця”;
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-parent:””;
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin-top:0cm;
mso-para-margin-right:0cm;
mso-para-margin-bottom:8.0pt;
mso-para-margin-left:0cm;
line-height:107%;
mso-pagination:widow-orphan;
font-size:11.0pt;
font-family:”Calibri”,sans-serif;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-bidi-font-family:”Times New Roman”;
mso-bidi-theme-font:minor-bidi;
mso-font-kerning:1.0pt;
mso-ligatures:standardcontextual;
mso-fareast-language:EN-US;}

DTEK coal mining enterprises put two new coal faces into operation, the company’s press service reported on Saturday, April 13.

“In general, since the beginning of the year, DTEK miners have already put 8 coal faces into operation, it will be possible to meet the fuel needs of thermal power plants in summer peaks and accumulate reserves until the next heating season, the statement said.

The company added that by 2024, 26 new coal faces are planned in its mines.

function news4677485() {
$.get(‘//’ + window.location.host + ‘/ajax/module.aspx?spm_id=444&id=4677485&lang=2&IsAjax=true’, function (data) { $(‘#nk4677485’).html(data); });
}

news4677485();

“Despite the enemy’s attacks on the energy sector, our task remains unchanged – to do everything for the stable operation of the energy system we understand that this summer, and then the next during the heating season, the work of our thermal power plants Obtaining fuel for generation requires rhythm and consistency in all processes, the launch of new longwalls is the basis for production and, accordingly, reliable operation of thermal generation, especially at the peak of consumption,” commented Ildar Saleev, General Director of DTEK Energy, at the launch of the new longwalls.

Let’s recall that it was previously reported that DTEK’s investments in Ukrainian coal mining by the end of 2023 amounted to approximately 7 billion UAH.


New Correspondent.net on Telegram and WhatsApp. Subscribe to our channels Athletistic and WhatsApp

Source: korrespondent

- A word from our sponsors -

Most Popular

LEAVE A REPLY

Please enter your comment!
Please enter your name here

More from Author

- A word from our sponsors -

Read Now

In Dnieper, two posts as a result of Rashistov’s united attack (photo)

Russian invaders on the night of June 7 made another combined attack in Dnipropetrovsk. .in_text_content_22 {width: 300px; Height: 600px; } @Media (min-width: 600px) {.in_text_content_22 {width: 580px; Height: 400px; }} .Adsbygoogle {Touch-Action: Manipulation; } Six missiles and 27 drones were shot down...

In Lutske, he completed the work of the rescue on the Meste Russian attack (photo, video)

In LUTSK, search and rescue work was completed on the site of the Russian attack conducted yesterday, June 6. .in_text_content_22 {width: 300px; Height: 600px; } @Media (min-width: 600px) {.in_text_content_22 {width: 580px; Height: 400px; }} .Adsbygoogle {Touch-Action: Manipulation; } This was announced...

50 “Shakhhedov”, rocket and cabin attacked at night the hacks – trees (video)

Russian invaders today, June 7, made the strongest during a complete military attack on Harkiva. Dozens of explosions were heard. .in_text_content_22 {width: 300px; Height: 600px; } @Media (min-width: 600px) {.in_text_content_22 {width: 580px; Height: 400px; }} .Adsbygoogle {Touch-Action: Manipulation; } The mayor...