HomeTechnologyNASA dates August or...

NASA dates August or September to the first Artemis mission to the Moon.

As part of this mission, the Orion capsule will orbit the Moon. | Font: POT

adUnits.push({
code: ‘Rpp_ciencia_espacio_Nota_Interna1’,
mediaTypes: {
banner: {
sizes: (navigator.userAgent.match(/iPhone|android|iPod/i)) ? [[300, 250], [320, 460], [320, 480], [320, 50], [300, 100], [320, 100]] : [[300, 250], [320, 460], [320, 480], [320, 50], [300, 100], [320, 100], [635, 90]]
}
},
bids: [{
bidder: ‘appnexus’,
params: {
placementId: ‘14149971’
}
},{
bidder: ‘eplanning’,
params: { ci: ‘1efdd’ }
},{
bidder: ‘rubicon’,
params: {
accountId: ‘19264’,
siteId: ‘314342’,
zoneId: ‘1604128’
}
},{
bidder: ‘amx’,
params: {
tagId: ‘MTUybWVkaWEuY29t’
}
},{
bidder: ‘oftmedia’,
params: {
placementId: navigator.userAgent.match(/iPhone|android|iPod/i) ? ‘22617692’: ‘22617693’
}
}]
});

POT returned the launch window for takeoff Artemis 1the first step towards bringing people back to Moon.

The space agency proposes launching the system as part of a rocket from August 23 to September 6. SLS and capsule Orion.

path to the moon

The date was provided by Jim Free, Associate Administrator of the Research Systems Development Program at POT, in an interview Ars Technique.

“That’s the goal we’re aiming for,” Free said. “It would be foolish not to focus on it now. We’ve made incredible progress in the last week.”

POT ensures that the fourth wet dress rehearsal of the rocket SLS was successful despite the fact that the previous count was not completed until the exact moment it should be released.

While not ideal, the agency considers the time it takes to fix problems encountered during testing, such as replacing a seal that caused a hydrogen leak, to be decent.

What will Artemis 1 be like?

Artemis 1 will consist in sending a rocket SLS with capsule Orion into orbit Moon.

SLS, the agency’s most powerful to date, it will propel a ship towards a satellite but will not carry people. However, all data obtained from the mission will serve to Artemis 2scheduled for 2023 (although with delays this may not happen until 2024) will put astronauts into the same lunar orbit.

Both missions will be key to Artemis 3culminating in the landing of a man on the moon in more than five decades.

We recommend METADATA, RPP’s technology podcast. News, analytics, reviews, recommendations and everything you need to know about the world of technology. To hear better, #StayHome.

Source: RPP

- A word from our sponsors -

Most Popular

LEAVE A REPLY

Please enter your comment!
Please enter your name here

More from Author

- A word from our sponsors -

Read Now

The Greek Catholic Church was separated before the transformation (photo)

In Potetskarpathy in the village of Palada-Komarivtsi, Uzhgorod district, July 16, the title of Greek Catholic Church was arson. Attories also left on the facade a provocative inscription aimed at inciting national and religious enmity, the photograph of which was later published on...

In the Kamensk region in the area of Dnipropetrovsk, the number of postal attacks by Bespitlovkov was distributed

Russian invaders today, July 18, attacked the drunken drones of the Kaminsky district of the Delipetrovsk region. .in_text_content_22 {width: 300px; Height: 600px; } @Media (min-width: 600px) {.in_text_content_22 {width: 580px; Height: 400px; }} .Adsbygoogle {Touch-Action: Manipulation; } As of the evening, two...